visual visual
Integrated Construction Management
> > SERVICES > QUALITY ASSURANCE > Instruments & Controls

Instruments & Controls

Consulting

  • Third Party QA Inspection, Audit, Quality Assurance Certification
  • Design Review; Include all associated Documentation; Drawings; SOP/Schematic Flow Diagrams/Isometrics/Graphic Displays(Samples of screen types and associated Menus)/IO List/Power-Signal Control Wire Diagrams/Control Panel Details Drawings/Schedules Values Dampers/Control System Hardware/Software Wiring/Floor Plans/ Schematic Control Diagrams/Software-firmware Operational Documentation/Specific Documentation requirements for Testing/Acceptance & Handover.
  • Specification Review of Concepts/Specifications/Parameters/Installation Philosophy /System Integration. Field Instrumentation (Pneumatic Field Instrumentation/Electronic Field Instrumentation)/Control Room Instrumentation (Safety Instrumentation System ESD (Emergency Shutdown)/F&G(Fire & Gas Systems)/Power Protection & Distribution (Voltage Sag Protection) Philosophy of Power Systems/Equipment Protection(Environmental Ingress(IP65) Tropicalization /Hermetic Sealing/Hazardous Areas/EX NEMA(ATEX/API/FM)RF Interface/Sealing Systems(Wet Gas/Process Fluids)Earthing System (Electrical Safety Earth/Instrument Clean Earth/Intrinsically Safe Earth)Vibration Protection (Lack of Vibration/Ease of access/Visibility)BAS(Building Automated System)Architecture (Capacity/functionality/Communications Protocols/Integration Applications/Failure Backup Devices/UPS/Power Supplies)
  • Review of Testing and Commissioning Procedures/Controls Validation and Verification/Field Quality Control Tests/Calibration & Testing Requirements/Instrument Equipment Interface(SMART/HART Protocols)Control System Logic/Program/Software(FAT/SAT)/Panel Spacing/Inspection/Pre Commissioning/calibration/SOPS/Loop Checking SOPS/Safety Device Settings(Process Switches/Safety Valves)/Simulation Testing(Interlocks/Shutdown System)/Sequence of Operations/FPT(Functional Performance Testing (Procedures/Protocols)/Operations and Maintenance Manuals/System Verification procedures.
  • Quality Training For all Installation Practices
  • Methods & Materials of Construction MTR/Traceability/Grade/Compatibility/Suitability/Galvanic Corrosion
  • Clean Build Methodologies Protocols

Compliance

  • Standards and Code Verification; in line with International Code and Standards
  • Owner Acceptance Verification in Line with Construction Protocols and Specifications
  • Facilities Acceptance Verification in Line with Testing and Commissioning Standards
  • Document Turnover Packages; compliance verification of QA Turnover Dossiers prior to Final Hand Over.