Third Party QA Inspection ,Audit ,Quality Assurance Certification
Specification Review; include all associated Documentation Drawings,SOP,System Flow Diagrams, P&ID,Duct Layout Drawings/ Chemical Lists/MSDS/Dry Scrubber Media Test Data(Emergency Systems) Major Equipment Specifications (Wet &Dry Scrubbers/ RTO Design/Exhaust Recycling) Vendor Specifications
Design Review; (Decentralized/Centralized/Low Pressure/High Pressure/ Basis for Design/Design Calculations/Identify Critical Parameters (Clean Room Layout/Spec/Energy Savings/OA Unit/AHU/Chiller LTCW/HTCW/HX/System Efficiencies/Balance/Redundancy) Benchmark against International Standrad and Industry Best Practice (Pipe Duct Supports/Connections) Exhaust System Layout by Type (Acid/Caustic/VOC/Emergency)
Design Optimization in line with state of the art Technologies & Best Engineering Practice. FFU Optimization/Air Recirculation/Air Treatment(Filters/Temperatures/Humidity/Controls
Review of Testing and Commissioning Procedures/Isometrics/Controls Validation and Verification./Acceptance Criteria and Requirements.
Quality Training For all Installation Practices
Methods and Materials of Construction MTR/Traceability/Grade/Compatibility/Purchase Specification.
Clean Build Methodologies Protocols
Compliance
Standards and Code Verification; in line with International Code and Standards
Owner Acceptance Verification in Line with Construction Protocols and Specifications
Facilities Acceptance Verification in Line with Testing and Commissioning Standards
Document Turnover Packages; compliance verification of QA Turnover Dossiers prior to Final Hand Over.