Integrated Construction Management
> > SERVICES > QUALITY ASSURANCE > Fire Protection

Fire Protection

Consulting

  • Third Party QA Inspection ,Audit ,Quality Assurance Certification
  • Specification Review; include all associated Documentation Drawings,SOP, MSDS/Instrumentation & Control Instrumentation & Equipment
  • Design Review; Passive or Automated Fire Systems/Detection/Containment/Control and Extinguishing Integrated System Approach to enable a total Building Fire Safety System/Building Construction Requirements Height area/Exposure & Separation Requirements/Room Occupancy/Interior & Exterior Finish/Check Code Compliance/Fire Safety Measures and design Strategy/Check Design achieves Safety Level(Evacuation/Recovery/Egress/Smoke). Identify Critical Systems and Emergency Backups (Diesel Generators ETC)
  • Design Optimization in line with state of the art Technologies & Best Engineering Practice.
  • Egress Requirements (Exit Access Paths/Exit Remoteness/Exit Discharge/Areas of Refuge/Door Locking Security Interface)
  • Fire Detection & Notification System (Detections Alarms/Klaxons/Strobes/Mass Notification/Survivability of System)
  • Fire Suppression Requirements(Water Supply water based fire extinguishing/non water based fire extinguishing/standpipes and fire department Hose outlets)
  • Emergency Power/Lighting &Exit Signage (Survivability of System/Electrical Safety/Distributed Energy Source)
  • Special Fire protection Requirements (Engineered Smoke Control/Special Hazard System/Fire Proofing/Fire Stopping/Atrium Spaces/Voids/Shafts/Mission Critical Facility needs)
  • Emergency Shutdown Systems(Ventilation/Eye Wash Stations/Safety Showers/Sprinkler Spacing/Sustainable Facilities tool
  • Review of Testing and Commissioning Procedures/Isometrics/Controls Validation and Verification.
  • Quality Training For all Installation Practices based on Best Industry Practice and Manufacturers Recommendation.
  • Methods and Materials of Construction MTR/Traceability/Grade/Compatibility/Fire Rating and System Type
  • Clean Build Methodologies Protocols

Compliance

  • Standards and Code Verification; in line with International Code and Standards
  • Owner Acceptance Verification in Line with Construction Protocols and Specifications
  • Facilities Acceptance Verification in Line with Testing and Commissioning Standards
  • Document Turnover Packages; compliance verification of QA Turnover Dossiers prior to Final Hand Over.