Third Party QA Inspection ,Audit ,Quality Assurance Certification
Specification Review; include all associated Documentation Drawings, SOP/MSDS
Design Review Concept/Regulatory Requirements/Client Requirements for Hazardous Gas and Chemicals/Review System &Area Classification GHS/OSHA to ensure System and associated SubSystems are ready or fit for Operation. Special Requirements Silane/HF
Design Optimization in line with state of the art Technologies & Best Engineering Practice.Leak Prevention/Detection/Containment(Double Containment/ASV/VMB) Labelling Requirements.
Review Testing & Commissioning Procedures/Isometrics/Controls Validation and Verification. ESO/PRD/PRD with Orifice/RFO
Quality Training For all Installation Practices IN Line with Industry Best practice and Manufacturers Recommendation.
Methods and Materials of Construction MTR/Traceability/Grade/Compatability.
Clean Build Methodologies Protocols
Compliance
Standards and Code Verification; in line with International Code and Standards
Owner Acceptance Verification in Line with Construction Protocols and Specifications
Facilities Acceptance Verification in Line with Testing and Commissioning Standards
Document Turnover Packages; compliance verification of QA Turnover Dossiers prior to Final Hand Over.