Integrated Construction Management
> > SERVICES > QUALITY ASSURANCE > Life & Safety

Life & Safety

Consulting

  • Third Party QA Inspection ,Audit ,Quality Assurance Certification
  • Specification Review; include all associated Documentation , Drawings, SOP.
  • Design Review; TLV(Threshold Limit Value) BEI (Biological Exposure Indicies) STEL (Short term Exposure Limits) PEL (Permitted Exposure Limits) TGMS (Total Gas Monitoring System) SIS (Safety Instrumated System) BMS (Building Management System) SRS (Safety Requirement Specification) Functional Requirements (Safety Monitoring/Safety Interlocks/Alarms/Notifications(Cause & Effects Matrix)/Integrity Requirements (Availability/Probability of Failure/Diagnostics) FMEA (Failure Modes and Effects Analysis) Hazop (Hazard &Operability Analysis) SIL (Safety Integrity Level) CMS (Continuous Monitoring System) ELV Systems (Extra low Voltage Systems) Functional Tests on Emergency Lighting/Battery Powered Emergency Lighting. Fire Life Safety (Performed in Coordination with Fire Protection Specialist) Review Fire Prevention/Fire Suppression/Emergency Evacuation/Response/Combustible Storage (Portable LPG) Emergency Access/Egress (Corridors/Stairwells/Exits)/Fire Lanes/Fire Doors/Alarm Systems (Pull Stations/Horns & Lights)
  • Design Optimization in line with state of the art Technologies & Best Engineering Practice.
  • Review of Testing and Commissioning Procedures/Isometrics/Controls Validation & Verification.
  • Quality Training For all Installation Practices
  • Methods and Materials of Construction MTR/Traceability/Grade/Compatibility
  • Clean Build Methodologies Protocols

Inspection

  • HPM Testing (Hazardous Production Material)NFPA 704
  • Midas Testing (Honeywell Gas Testing)
  • Vertex Testing (Honeywell Gas Detection Monitoring)
  • Perm Alert Installation and De Installation (Liquid Leak Detection/Location Systems Pal-At Liquid Watch/Fluid Water)

Compliance

  • Standards and Code Verification; in line with International Code and Standards
  • Owner Acceptance Verification in Line with Construction Protocols and Specifications
  • Facilities Acceptance Verification in Line with Testing and Commissioning Standards
  • Document Turnover Packages; compliance verification of QA Turnover Dossiers prior to Final Hand Over.