SERVICES
SERVICES chevron_right QUALITY ASSURANCE
Fire Protection

Consulting

addThird Party QA Inspection ,Audit ,Quality Assurance Certification

addSpecification Review; include all associated Documentation Drawings,SOP, MSDS/Instrumentation & Control Instrumentation & Equipment

addDesign Review; Passive or Automated Fire Systems/Detection/Containment/Control and Extinguishing Integrated System Approach to enable a total Building Fire Safety System/Building Construction Requirements Height area/Exposure & Separation Requirements/Room Occupancy/Interior & Exterior Finish/Check Code Compliance/Fire Safety Measures and design Strategy/Check Design achieves Safety Level(Evacuation/Recovery/Egress/Smoke). Identify Critical Systems and Emergency Backups (Diesel Generators ETC)

addDesign Optimization in line with state of the art Technologies & Best Engineering Practice.

addEgress Requirements (Exit Access Paths/Exit Remoteness/Exit Discharge/Areas of Refuge/Door Locking Security Interface)

addFire Detection & Notification System (Detections Alarms/Klaxons/Strobes/Mass Notification/Survivability of System)

addFire Suppression Requirements(Water Supply water based fire extinguishing/non water based fire extinguishing/standpipes and fire department Hose outlets)

addEmergency Power/Lighting &Exit Signage (Survivability of System/Electrical Safety/Distributed Energy Source)

addSpecial Fire protection Requirements (Engineered Smoke Control/Special Hazard System/Fire Proofing/Fire Stopping/Atrium Spaces/Voids/Shafts/Mission Critical Facility needs)

addEmergency Shutdown Systems(Ventilation/Eye Wash Stations/Safety Showers/Sprinkler Spacing/Sustainable Facilities tool

addReview of Testing and Commissioning Procedures/Isometrics/Controls Validation and Verification.

addQuality Training For all Installation Practices based on Best Industry Practice and Manufacturers Recommendation.

addMethods and Materials of Construction MTR/Traceability/Grade/Compatibility/Fire Rating and System Type

addClean Build Methodologies Protocols


Compliance

addStandards and Code Verification; in line with International Code and Standards

addOwner Acceptance Verification in Line with Construction Protocols and Specifications

addFacilities Acceptance Verification in Line with Testing and Commissioning Standards

addDocument Turnover Packages; compliance verification of QA Turnover Dossiers prior to Final Hand Over.

© 2015 TKIS LLC All Rights Reserved.